Client

Challenge:




Solution:

Leading Developer of Accounting Software Systems

Production was handled in house by a small team of packers. Print quantities were based on “life of product” expectations and warehoused until shipped or outdated. As a result, there was an excessive amount of capital committed to inventory. Unpredictable rates of obsolescence added to the overall inventory risk. 

S.P.A., Inc. analyzed production practices and over 2,000 inventory components and suggested Just-In-Time manufacturing of most documents. Using a combination of high speed Xerox digital technology and traditional offset, S.P.A., Inc. reduced inventory levels dramatically. Print runs are now based on monthly usage expectations, limiting inventory risk. Quick turn on manuals and other components resulted in higher inventory turns and reduced waste. 

All component storage was removed from the clients office environment, freeing up much needed space for their development team. Moving the inventory closer to production and material handling equipment reduced turn times and expensive overhead. 

A wide area network (WAN) was installed to allow for instant transmission of shipping data to a dedicated assembly team, which builds the shipment on the spot in a pick & pack arrangement. Financial analysis indicates annual savings approaching 35% with the revised manufacturing operation. 

S.P.A. - 4650 Lake Forest Dr. Suite 580 - Cincinnati, OH 45242 
Toll Free: (800) 837-4399, PH: (513) 733-8800, FAX: (513) 733-5599